We are doing a mock data conversion test of our legacy data, to our SAP PRE-PROD ECC system. I'm noticing a lot of HANA alert 88. Delta merge is failing while the data load is happening. I have a couple of questions.
1. Is it possible to turn off the delta merge system wide during the load? In our mock test it is taking 4 days to complete. The system will be up and available to the business during the load. I have concerns about turning it off for that long.
2. What are the best practices around delta merge during a large data load?