These are the steps we followed for loading the CVS file into HANA
1. created a table in our Hana server(not sap demo server)
2. uploaded data file into Server(did not use ftp)
3.created a text file with import command and placed the file in the same path as the data file in the Server
4. Execute command "Import from '/folder1/folder2/file.ctl' " from the hana sql editor
I am facing the error "general error: Cannot open Control file"
Please Help. Thanks in advance