Quantcast
Channel: SCN : Discussion List - SAP HANA and In-Memory Computing
Viewing all articles
Browse latest Browse all 5653

hana upgrade ( 41 to 69) issues

$
0
0

After upgrading ( updated SUm first and then installed HLM via hana studio running in the han host) SUM and the new HLM installtation from the hana studio in a DELL HANA system, I have noticed that below folders ( hdbclient  , hdbstudio , hdbstudio_update,  HLM , lm_structure  ,SUM,  trans) were created under /hana/exeini/<SID> and the folders  bclient,  hdbstudio & hdbstudio_update  were dropped from /usr/sap automatically.

Is it  something normal ?

Also now If I execute the HLM to upgrade the hana from 41 to 59  from my desktop hana studio , i am getting out of space error on  /hana/exeini during the HLM pre upgrade checker phase. Is it something happen in Dell applience often and how to fix this?


      Preinstall check
failed

 

        Not enough
disk space:

 

        | Mount
Point  | Required disk space (KB) |
Available disk space (KB) |

 

        | /hana/exeini
| 10345196                 | 4468344                   | <== NOT ENOUGH SPACE
LEFT

 

 

Thanks.


Viewing all articles
Browse latest Browse all 5653

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>